Flat Cable Assembly

Case Study

//Flat Cable Assembly

Project Details

Disciplines:

Capabilities:

Suppliers:

Flat Cable Assembly2018-09-01T05:38:13-04:00

Project Description

Overview

Customer challenged DNA Asia to supply an equivalent 20pin ribbon cable connector that was superior to their existing vendor’s product but cheaper in price.

Challenges

  • Replacing a brand name vendor as the customer’s vendor of choice.
  • Beating the competitor on price and quality

Services Performed

  • DNA Asia modified an existing terminal housing mold to create an equivalent product.

Results

  • The lead time for drawing and first sample was 3 weeks.
  • DNA Asia supplied a higher quality product at a lower cost.

Download PDF

DNA Group is available during our normal business hours. Our team is still here for you during this trying time, just as we've always been. Please don't hesitate to Contact Us.

Got it!
X