Project Description

Overview

A large OEM for streaming devices provided many challenging demands on Aces and required solutions within a short time frame.

Challenges

  • High volume production demand
  • Steep production ramp timeline
  • Strict environmental testing requirements before production ramp

Services Performed

  • Aces fabricated 2 additional sets of tooling and 3 new automatic assembly lines in 45 days.
  • Through their own plating facility, Aces was able to provide testing samples within 3 hours for customer’s verification.

Results

  • Shipped 10 million pairs of connectors in 4 months of peak production without quality issue.
  • The customer is the top streaming device manufacturer on the market.